When to book low voltage pre-wire on a new build
The short answer: book it while the house is still at framing, before insulation and drywall. That's the one stage where low voltage cable can go exactly where it needs to, with no walls to open later. This post explains why the timing matters, what we need from you, and what a pre-wire actually covers.